Two new reports with results of the BOX-WIN project have now been published. These Technical Reports can now be downloaded from our Downloads page.
Technical Report no. 6
“Long-time behaviour of mustard gas dumped in the Bornholm Basin”
Technical Report no. 7
“Survey of Swedish suppliers to a floating wind turbine unit equipped with pumps for oxygenation of the deepwater”
The results presented in these reports are important for the environmental assessment and the construction of a Demonstrator in the Bornholm Basin.