← News

BOX-WIN Technical Report no. 8 published

The latest report with results of the BOX-WIN project has just been published:

Technical Report no. 8 — “Plan and Cost Estimate for a Demonstrator – a floating wind turbine unit equipped with pumps for oxygenation of the deepwater, and associated patents and immaterial rights”.

In this report, the estimated costs for the realization of a Demonstrator are presented together with an expected time schedule. Costs for alternative configurations and larger systems of pumps are also estimated.

This Technical Report can now be downloaded from our Downloads page.

All BOX-WIN Technical Reports are available on the Downloads page.

Facts & sources

For further reading, see the relevant authorities and official sources:

Read more

Related coverage and background can be found at, among others: