More BOX-WIN results published
Two new reports with results of the BOX-WIN project have now been published. These Technical Reports can be downloaded from our Downloads page.
Technical Report no. 6 — “Long-time behaviour of mustard gas dumped in the Bornholm Basin”.
Technical Report no. 7 — “Survey of Swedish suppliers to a floating wind turbine unit equipped with pumps for oxygenation of the deepwater”.
The results presented in these reports are important for the environmental assessment and the construction of a Demonstrator in the Bornholm Basin.