← News

More BOX-WIN results published

Two new reports with results of the BOX-WIN project have now been published. These Technical Reports can be downloaded from our Downloads page.

Technical Report no. 6 — “Long-time behaviour of mustard gas dumped in the Bornholm Basin”.

Technical Report no. 7 — “Survey of Swedish suppliers to a floating wind turbine unit equipped with pumps for oxygenation of the deepwater”.

The results presented in these reports are important for the environmental assessment and the construction of a Demonstrator in the Bornholm Basin.

All BOX-WIN Technical Reports are available on the Downloads page.