New BOX-WIN reports published
The latest results of the BOX-WIN project have now been published. The results are presented in two Technical Reports which can be downloaded from our Downloads page.
Technical Report no. 4 — “Assessing feasible mooring technologies for a Demonstrator in the Bornholm Basin as restricted to the modes of operation and limitations for the Demonstrator”.
Technical Report no. 5 — “Assessing important technical risks from use of a floating wind turbine unit equipped with pumps for oxygenation of the deepwater”.
These reports concern mooring of a Demonstrator and the technical risks which need to be considered in its construction.