← News

New BOX-WIN reports published

The latest results of the BOX-WIN project have now been published. The results are presented in two Technical Reports which can be downloaded from our Downloads page.

Technical Report no. 4 — “Assessing feasible mooring technologies for a Demonstrator in the Bornholm Basin as restricted to the modes of operation and limitations for the Demonstrator”.

Technical Report no. 5 — “Assessing important technical risks from use of a floating wind turbine unit equipped with pumps for oxygenation of the deepwater”.

These reports concern mooring of a Demonstrator and the technical risks which need to be considered in its construction.

All BOX-WIN Technical Reports are available on the Downloads page.